PURETE
a1
a1-b

G1-1 Automatic Roller coating production line
Intelligent unmanned production.Specialized for large panels, fully automatic loading and unloading, linked to intelligent control systems, unmanned painting plane.

VIDEO

G1-3

ADVANTAGES

b93
01
18mm steel plate welding structure, stable and solid
b94
02
Stability: adopting casting whole seat, 2.5T load-bearing lifting seat, to meet the load power output under stable operation
b95
03
Motor power: adopting high quality Siemens motor with RV reducer/hyperbolic reducer to meet various application environments

TECHNICAL SPECIFICATIONS

Total power
57KW
Staffing
3-5
Air consumption
700L/H
line speed
5-20m/min
Installation are
6*4m
Capacity
1200M²/8H
prodution cycle
15days
Caoting cost
3-5yuan/m²
×